Capital Interchange Way delivers 420 new homes and over 4,000 sqm of commercial space as part of Brentford’s major regeneration initiative. Our team has played a key role in transforming this complex brownfield site with a strong emphasis on sustainability – contributing to a BREEAM ‘Excellent’ rating and a 46% reduction in regulated carbon emissions.
Case study category: Residential
International Way
International Way is a landmark residential development by Telford Homes, located in Stratford, East London. The scheme comprises two 26-storey towers delivering a total of 380 new homes – including 247 build-to-rent apartments and 133 affordable homes – alongside office and commercial spaces. Strategically positioned adjacent to Stratford International Station, the development offers outstanding connectivity and is designed to foster a vibrant sense of community. Residents benefit from shared gardens and amenities such as a lounge, terrace, and gym.
Manor Rd
Manor Road is a landmark mixed-use development in Canning Town, delivering 355 new homes across three buildings – including a 34-storey tower clad in terracotta and glass. Situated in one of London’s fastest-growing residential areas, the development plays a central role in Canning Town’s regeneration. It combines high-rise living with affordable housing and carefully designed public space, creating a vibrant and inclusive urban environment.
Alperton Bus Depot
Steel Build Ltd is proud to contribute to the Alperton Bus Depot development, a significant project led by Telford Homes. This mixed-use development involves transforming the site into residential and commercial spaces while preserving essential transport infrastructure.
Botanical Place
Botanical Place is a retirement-led, mixed-use development comprising 196 high-specification apartments, rooftop gardens, and a range of shared amenities including a wellness centre, café, and public square. Developed in partnership with Retirement Villages Group, the scheme is designed to meet Whole Life Zero Carbon targets through features such as photovoltaic panels, the exclusion of fossil fuels, and enhanced energy performance standards.
This comprehensive package was tailored to support both the functional and architectural requirements of the development.
Challenges & Solutions
The diverse nature of the metalwork elements – ranging from structural steels to decorative architectural features – required precise integration with multiple construction disciplines across various phases of the build.
To address this complexity:
- Steel Build Ltd engaged early with the design team and main contractor, participating in coordination meetings to align methodologies and sequencing.
- Shared 3D modelling and BIM coordination ensured accurate detailing of interfaces and helped prevent on-site clashes.
- Our collaborative approach facilitated seamless installation and supported the wider programme objectives.
Results & Impact
- High-Quality Delivery: Steel Build Ltd successfully delivered all elements to an exceptional standard, with precise installation and a high level of finish throughout.
- Architectural Enhancement: The decorative panels, canopies, and balustrades contribute to the distinctive identity of Botanical Place, reflecting the development’s premium positioning.
- Performance-Driven Integration: Elements such as thermal breaks and plant screen supports were executed with technical precision, supporting both energy performance and structural integrity.
This project further demonstrates Steel Build Ltd’s capability in delivering coordinated metalwork solutions for sustainable, design-led residential and mixed-use schemes.
Baltimore tower
Steel Build Ltd were proud to be part of the Baltimore Tower project, also known as Arena Tower. At the time of its construction, the tower was the tallest residential building in the UK, standing at 489 ft, and remains a landmark on the London skyline.